1-1 of 1 Answer
This installation service includes delivery and unpack of the new appliance, disconnection of the existing refrigerator, connection to existing water shut off valve and 110V outlet, leveling of the refrigerator, product testing and demonstration, and removal of all packaging materials.
This answer was generated by AI based on customer and product data.
