1-1 of 1 Answer
Make sure the shut-off valve connecting your refrigerator to the water line is turned on. It is typically located either behind the refrigerator or in the basement ceiling. Ensure the water reservoir tank is full. Press the dispenser for 2 to 3 minutes to allow the reservoir and internal tubing to fill completely. Once water begins dispensing, purge any air from the lines by dispensing water for 5 minutes or 2 gallons. If the doors were removed during installation, make sure the wiring harness was reconnected when the doors were reinstalled. Please refer to the illustration on page 21 of the Installation Guide for this model. You can find it by visiting the product page, clicking the “Features” tab, and navigating to the Manuals and Guides section. If further assistance is needed, please contact our Bodewell Services team at 1-833-426-3393 to schedule an appointment.
Sorry, there was a problem. Please try again later.
