1-1 of 1 Answer
The installation process for the Alloy Scoop Bezel takes approximately 2 minutes. Simply connect the four corners usingthe provided corner keys, hook the frame onto the top edge of the TV, and watch as the side latches click into place.
This answer was generated by AI based on customer and product data.
