About 5 minutes.
Sorry, there was a problem. Please try again later.These units are designed to give a few minutes of safe operation, so that the operator can safely shut down and save data before powering off the computer during a black-out situation. The are not meat to be a long term powers source during black-outs. If that is what you need, I would look at a backup Generator powered by some form of gas that would be located outside the building and wired by professionals into the building electrical system. Again depending on the load, run time maybe 10 to 15 minutes at most.
Sorry, there was a problem. Please try again later.7 to 10 minutes at that load if you’re sure it’s a consistent 700w usage.