Early Black Friday Deals & DoorbustersEnds Nov. 8.Shop now

Skip to contentGo to Product Search
Main Content

Avery - Corner Lock, 3-Hole Punched Plastic Sleeves, Heavyweight, 8-1/2” x 11”, 4/Pack - Clear

Model: 72269
SKU: 12327087

Reviews coming soon

Sold & shipped by

About this product

Protect charts, resumes, and other forms with these letter-size plastic sleeves. The corner lock feature makes it easy for these sleeves to fit documents snugly, preventing them from falling out, while the three-hole punched design lets you easily add them to binders. These Avery corner-lock plastic sleeves are transparent, making it easy to quickly identify papers at a glance without needing to go through the hassle of removing them.

Features

  • Sheet protectors to prevent degradation of paper inserts

  • Clear plastic material allows for easy viewing

  • Overall dimensions: 9.5"W x 11.75"L; hold up to 20 sheets of 8.5" x 11" paper

  • Three-hole punched and ready for use

  • Four per pack

  • Corner-lock tabs keep documents secure

Specifications

  • Number Of Holes
    3
    Number of Units Per Package
    9
Sponsored

Reviews

This product doesn't have any reviews yet.

Compare similar products

Avery - Corner Lock, 3-Hole Punched Plastic Sleeves, Heavyweight, 8-1/2” x 11”, 4/Pack - Clear
Avery - Corner Lock, 3-Hole Punched Plastic Sleeves, Heavyweight, 8-1/2” x 11”, 4/Pack - Clear

Protect charts, resumes, and other forms with these letter-size plastic sleeves. The corner lock feature makes it easy for these sleeves to fit documents snugly, preventing them from falling out, while the three-hole punched design lets you easily add them to binders. These Avery corner-lock plastic sleeves are transparent, making it easy to quickly identify papers at a glance without needing to go through the hassle of removing them.

Avery - Avery® Letter File Sleeve - 8 1/2" x 11" - 100 Sheets Capacity - Polypropylene - Clear - 12 / Pack
4.0(1)

Keep important papers organized and protected against harm with this clear plastic sleeve. Lightweight, durable plastic is sealed on two sides to keep loose papers securely tucked within the sleeve while a notch in the front cover lets you quickly grasp papers to remove them. Acid-free, archival-safe material ensures your documents are safely guarded, and the nonstick cover won't cling to inserts and lift print away. Transparent plastic lets you identify the contents of each sleeve with a glance so you can always be sure you've got the right paperwork for the project.

C-line - Top Load Sheet Protector, 11" x 8-1/2", 8 Tab Set - Clear

A top loading polypropylene sheet protector and index all in one! Now you don't have to buy oversized indexes separately. Use to index ring binders. Eight clear tabs. Sheet protectors with index tabs are an excellent way to organize yourself instantly. Acid-free protection eliminates photocopy transfer. Includes laser/inkjet printable tabs. Insert size: 11x 8 1/2. 8/ST.

C-line - Heavyweight Sheet Protectors, 11" x 8-1/2", Assorted Colors, 8 Tab Set - Multicolor

Heavyweight Sheet Protectors, 11" x 8-1/2", Assorted Colors, 8 Tab Set

Specs

Be the first to ask a question.

We’ll try to get your question answered within 24 hours by a Best Buy customer or brand representative.

No content
Sponsored