Tracki - Mini GPS Tracker, Subscription Required, Cancel Anytime – Universal Compact 4G LTE Tracker for Vehicles - Black
Reviews coming soon
About this product
Tracki Universal is a compact 4G LTE mini GPS tracker built for vehicles, motorcycles, trailers, luggage, and equipment, as well as personal use for kids or seniors with their knowledge and consent. A cellular subscription is required to activate tracking, and the plan can be canceled anytime. Features include real-time location tracking, location history, customizable geofencing alerts, and an SOS/beep locator to help you find the device when it's nearby. Its small, discreet size makes it easy to hide or attach nearly anywhere, giving you flexible tracking for what matters most to you.
Features
COMPACT EVERYDAY TRACKING
For owners comparing the best hidden gps tracker for car and other everyday valuables, Tracki Universal keeps tracking small and flexible at about 1.77 x 1.46 x 0.55 inches and 1.26 oz, with clip options for cars, bags, luggage, or assets.
VERSATILE RIDE & ASSET USE
This motorcycle gps tracker also works for cars, bags, luggage, and everyday assets with 4G LTE Cat1 coverage, 1-minute auto updates, 5-second manual pings, and SMS (Subscription-enabled add-on), email, or app alerts through iOS, Android, and web app.
SUBSCRIPTION-POWERED SERVICE
Subscription Required, Cancel Anytime; the connected service powers the built-in global SIM, real-time tracking, app access, location alerts, worldwide cellular coverage, support, and ongoing device connectivity.
SMALL SIZE, SMART ALERTS
This micro gps tracker uses geofences, speed, movement, and SOS alerts to help you stay informed, with 1 SOS and 2 assignable buttons, plus an audible beep locator and Bluetooth proximity mode to find the device nearby in the app.
FLEXIBLE VEHICLE SETUP
For customers choosing the best gps tracker for car options, Tracki Universal has a replaceable 600mAh battery for 5 to 7 days active use or up to 45 days in battery save mode, and can be used with our Universal-only Waterproof Magnetic Box / Battery Extender, Hardwire Kit, and OBD Micro Wiring Cable.
Specifications
- Number of Units Per Package1GPS EnabledYesBattery Life (up to)5 days
Reviews
This product doesn't have any reviews yet.
Compare similar products

Tracki Universal is a compact 4G LTE mini GPS tracker built for vehicles, motorcycles, trailers, luggage, and equipment, as well as personal use for kids or seniors with their knowledge and consent. A cellular subscription is required to activate tracking, and the plan can be canceled anytime. Features include real-time location tracking, location history, customizable geofencing alerts, and an SOS/beep locator to help you find the device when it's nearby. Its small, discreet size makes it easy to hide or attach nearly anywhere, giving you flexible tracking for what matters most to you.

Keep your vehicle safe anywhere, anytime with the Tracki Pro GPS Tracker. This best small GPS tracker is compact, waterproof, and designed for discreet use under cars, trailers, or any metal surface as an undetectable car tracker. With a strong magnet and multiple mounting options, it attaches securely without being noticed. Monitor your car, truck, or trailer in real-time with accurate small trackers with GPS. Track location, speed, movement, and geofence alerts instantly through Android, iOS, or web apps. Ideal as a gps tracker for trailer or car GPS tracker for personal vehicles, fleet, or business use.The ultra-long battery lasts up to 7 months per charge, depending on usage, making this auto tracker for vehicles perfect for long-term monitoring. Works worldwide with GPS, Glonass, BDS, LTE CAT4 & CAT1 networks, and Wi-Fi for indoor tracking. Setup is fast and simple, with included accessories for mounting and versatile placement.Tracki Pro ensures your vehicle is always protected with professional-grade, reliable tracking in a discreet, compact device.Tracki Pro ensures your vehicle is always protected with professional-grade, reliable tracking in a discreet, compact device.

GPS vehicle and asset tracker with one year rechargeable battery and powerful magnetic base. Track your vehicles or equipment worldwide using this 4G LTE vehicle tracker. Cube reports location history and speed. Set geo fences to see when your car moves in or out of boundaries you set in the app. Data plans start at $16.50/month with live real time tracking.

Track your vehicle with CarLock — a real-time 4G GPS car tracker designed for personal use, families, teen drivers, and small fleets. CarLock delivers fast, accurate location updates and instant alerts straight to your phone. View live location, trip history, mileage, and driving events anytime in the Android or iOS app. Monitor driving behavior with alerts for speeding, harsh braking, and sharp turns, plus customizable geofences for arrivals and departures. CarLock enhances your vehicle’s security with notifications for movement, engine starts, vibrations, or device disconnection. Easy to install via the OBD-II port, CarLock monitors your vehicle 24/7, even when the engine is off, and supports multiple vehicles in one account. With reliable coverage, detailed history, and an affordable subscription with the first month free, CarLock delivers dependable, all-in-one vehicle tracking.
| Pros for Tracki - Mini GPS Tracker, Subscription Required, Cancel Anytime – Universal Compact 4G LTE Tracker for Vehicles - Black | |||
|---|---|---|---|
| There were no pros for this product— | There were no pros for this product— | Battery Life, Accuracy, Overall Performance, Ease of use, Magnet Strength | Setup Ease, Tracking Accuracy |
| Cons for Tracki - Mini GPS Tracker, Subscription Required, Cancel Anytime – Universal Compact 4G LTE Tracker for Vehicles - Black | |||
| There were no cons for this product— | There were no cons for this product— | Connectivity, USB Port | There were no cons for this product— |
Specs
Be the first to ask a question.
We’ll try to get your question answered within 24 hours by a Best Buy customer or brand representative.








































