CARLOCK - Wired Hidden GPS Tracker for Vehicles - 12-24v Battery, Anti Theft Car Device, 4G LTE, Instant Alerts, Easy Install
About this product
Track your vehicle with CarLock Wired—a real-time 4G GPS car tracker designed for personal use, families, teen drivers, and small fleets. CarLock delivers fast, accurate location updates and instant alerts straight to your phone. View live location, trip history, mileage, and driving events anytime in the Android or iOS app. Monitor driving behavior with alerts for speeding, harsh braking, and sharp turns, plus customizable geofences for arrivals and departures. CarLock enhances your vehicle’s security with notifications for movement, engine starts, vibrations, or device disconnection. Easy to install - With just two wires to connect to your car battery, anyone can install CarLock Wired in seconds. CarLock monitors your vehicle 24/7, even when the engine is off, and supports multiple vehicles in one account. With reliable coverage, detailed history, and an affordable subscription with the first month free, CarLock delivers dependable, all-in-one vehicle tracking.
Features
REAL-TIME VEHICLE TRACKING
Track your car live with fast, accurate GPS updates. Review routes, mileage, stops, and full trip history anytime through the CarLock app (iOS and Android) — ideal for families and small fleets.
TEEN, FAMILY & FLEET DRIVER MONITORING
Keep young, elderly, or employee drivers safe with instant notifications for harsh acceleration, hard braking, sharp cornering, and speeding. CarLock also generates a real-time Driver Safety Score to help you monitor driving behavior trends.
WORK & SLEEP WITHOUT WORRY
CarLock GPS car tracker monitors your vehicle in real-time and alerts you on your phone when your vehicle is moved, when the engine starts, if unusual vibration is detected & even if the device is disconnected!
VIRTUAL MECHANIC
CarLock actively monitors the health of your vehicle and alerts you in advance if your car battery is running dangerously low or is experiencing high battery drain.
EXTREMELY AFFORDABLE
CarLock GPS vehicle tracker uses cloud computing, internet storage, GPS tracking and a modern day app (Android & iOS). You get all this for only $9.95 per month and the first month is FREE!
Specifications
- Remote StartNoKeyless EntryNoUnlimited Transmitter RangeNo2-Way PagingNo
Reviews
This product doesn't have any reviews yet.
Compare similar products

Track your vehicle with CarLock Wired—a real-time 4G GPS car tracker designed for personal use, families, teen drivers, and small fleets. CarLock delivers fast, accurate location updates and instant alerts straight to your phone. View live location, trip history, mileage, and driving events anytime in the Android or iOS app. Monitor driving behavior with alerts for speeding, harsh braking, and sharp turns, plus customizable geofences for arrivals and departures. CarLock enhances your vehicle’s security with notifications for movement, engine starts, vibrations, or device disconnection. Easy to install - With just two wires to connect to your car battery, anyone can install CarLock Wired in seconds. CarLock monitors your vehicle 24/7, even when the engine is off, and supports multiple vehicles in one account. With reliable coverage, detailed history, and an affordable subscription with the first month free, CarLock delivers dependable, all-in-one vehicle tracking.

Track your vehicle in real time and get instant notifications of your car’s whereabouts and movements. Built-in GPS and reliable coverage keep you connected 24/7.

Install as a standalone GPS tracking system OR add unlimited range control to any Compustar remote start/security system. Built-in backup battery for added security. Powered by AT&T LTE for industry-leading coverage and reliability.








































