1-3 of 3 Answers
Hi Vest - Thanks for choosing GE Model GTS17DTNRWW and welcome to the family! When a refrigerator or freezer is first installed, allow 24 hours for it to stabilize to normal operating temperatures. Some cooling should be obvious in the freezer within approximately one hour. See REFRIGERATOR TEMPERATURE STABILIZATION PERIOD: https://products.geappliances.com/appliance/gea-support-search-content?contentId=18942 - Keep in touch at GEAppliances.com. Sue
Sorry, there was a problem. Please try again later.The freezer part was nice and cool after a couple of hours; the lower part took about 4 hours.
Sorry, there was a problem. Please try again later.I filled it within the hour. It's very cold.
Sorry, there was a problem. Please try again later.
