Rinse and Spin is 19 min Quick Cycle 22 min Perm Press 50 min Delicates 44 min Normal 45 min Heavy 1hr 59min Whites 1hr 3 min Bedding 1hr 15 Sanitize 2hr 28min Those are the factory presets. You can adjust rinses and soil level and that affects the time either way depending on settings you choose.
Sorry, there was a problem. Please try again later.I will typically do a heavy duty load and that takes approx 2 hours, otherwise normal loads are an hour.