Appliances Memorial Day SaleFree delivery. Ends 6/3. Terms apply.Shop now

Main Content
In GPS Trackers

CARLOCK - 4G Car Tracker – GPS Vehicle Tracking for Families, Teens & Fleets with Driving Score, Trip History & Geofencing - Black

SKU: 6644755
$49.99
or
Availability
Pickup at
Act fast - Only 1 left at your store!
Sold by
Best Buy

About This Item

Track your vehicle with CarLock — a real-time 4G GPS car tracker designed for personal use, families, teen drivers, and small fleets. CarLock delivers fast, accurate location updates and instant alerts straight to your phone. View live location, trip history, mileage, and driving events anytime in the Android or iOS app. Monitor driving behavior with alerts for speeding, harsh braking, and sharp turns, plus customizable geofences for arrivals and departures. CarLock enhances your vehicle’s security with notifications for movement, engine starts, vibrations, or device disconnection. Easy to install via the OBD-II port, CarLock monitors your vehicle 24/7, even when the engine is off, and supports multiple vehicles in one account. With reliable coverage, detailed history, and an affordable subscription with the first month free, CarLock delivers dependable, all-in-one vehicle tracking.
  • Key Specs
    • GPS Enabled: true
  • General
    • Brand: CARLOCK
    • Product Name: CARLOCK 4G Car Tracker – GPS Vehicle Tracking for Families, Teens & Fleets with Driving Score, Trip History & Geofencing
    • Color: Black
  • Compatibility
    • App Compatible: true (The product can be connected to a program or software application on a mobile device, which then receives collected data from the product.)
  • Features
    • GPS Enabled: true
    • Protective Qualities: None, None, None, None, None
    • Wireless Connectivity: Bluetooth, None, None, None, None (The manner in which a device sends data to another device over a short distance without the use of wires or cables.)
  • Dimensions
    • Product Height: 2.756 inches (The out of box height of the item. Height is measured as the vertical distance from the bottom of the item to the top as it would be primarily used or placed.)
    • Product Length: 1.024 inches (The out of box length of the item. Length is measured as the longest dimension of the item.)
    • Product Width: 1.969 inches (The out of box width of the item. Width is measured as the horizontal distance from one side of the item to the other as it would be primarily used or placed.)
    • Product Weight: 0.14 ounces (The out of box weight of the item.)
  • Warranty
    • Warranty - Parts: FULL
    • Warranty - Labor: FULL
  • Other
    • UPC: 691959787571

Track your vehicle with CarLock — a real-time 4G GPS car tracker designed for personal use, families, teen drivers, and small fleets. CarLock delivers fast, accurate location updates and instant alerts straight to your phone. View live location, trip history, mileage, and driving events anytime in the Android or iOS app. Monitor driving behavior with alerts for speeding, harsh braking, and sharp turns, plus customizable geofences for arrivals and departures. CarLock enhances your vehicle’s security with notifications for movement, engine starts, vibrations, or device disconnection. Easy to install via the OBD-II port, CarLock monitors your vehicle 24/7, even when the engine is off, and supports multiple vehicles in one account. With reliable coverage, detailed history, and an affordable subscription with the first month free, CarLock delivers dependable, all-in-one vehicle tracking.

  • Real-Time Vehicle Tracking: Track your car live with fast, accurate GPS updates. Review routes, mileage, stops, and full trip history anytime through the CarLock app (iOS and Android) — ideal for families and small fleets.
  • Teen, Family & Fleet Driver Monitoring: Keep young, elderly, or employee drivers safe with instant notifications for harsh acceleration, hard braking, sharp cornering, and speeding. CarLock also generates a real-time Driver Safety Score to help you monitor driving behavior trends.
  • Work & Sleep Without Worry: CarLock GPS car tracker monitors your vehicle in real-time and alerts you on your phone when your vehicle is moved, when the engine starts, if unusual vibration is detected & even if the device is disconnected!
  • Virtual Mechanic: CarLock actively monitors the health of your vehicle and alerts you in advance if your car battery is running dangerously low or is experiencing high battery drain.
  • Extremely Affordable: CarLock GPS vehicle tracker uses cloud computing, internet storage, GPS tracking and a modern day app (Android & iOS). You get all this for only $9.95 per month and the first month is FREE!
  • Compatibility: Available on iOS and Android, our app is regularly updated to deliver better performance and exciting new features.
  • Flexible Installation Options: Optional CarLock extension, power and splitter cables allow you to hide CarLock GPS tracker for a more discreet setup while keeping your OBD-II port accessible.
  • Fast Refresh Rates: Enjoy rapid GPS update intervals for accurate, up-to-date tracking. The Premium plan refreshes every 7 seconds for near real-time movement monitoring.
  • Multiple Vehicle Support: Monitor several cars and drivers from one CarLock account. All vehicles appear on a single map — ideal for families, rental hosts or small fleets.
  • Track Even When the Car Is Off: CarLock continues tracking even when the engine is off, letting you see if your vehicle is pushed, rolled, or towed without your knowledge.
  • Custom Geofence Alerts: Create virtual boundaries and get notified when a vehicle arrives at or leaves key locations. Perfect for school drop-offs, job sites, home, or rental returns.
  • Trip Tagging for Business or Personal Use: Easily label trips as business or personal to simplify expense tracking and mileage reporting.
Whats Included
  • CarLock OBD Device
  • User manual
  • Activation card

Q: Does this car tracker have a virtual boundary alert?

A: Yes, you can create virtual boundaries and get notified when a vehicle arrives or leaves.

Q: Does this car tracker monitor hard braking?

A: Yes, this car safety device detects hard breaking.

Q: Does this car tracker monitor the car's battery?

A: Yes, the CarLock actively monitors the health of your vehicle and alerts you if the car battery is running low.

Q: Will this car tracker alert me if unusual vibration is detected?

A: Yes, this car device alerts you if unusual vibration is detected.

Q: What does the CarLock solution monitor?

A: The CarLock solution monitors car security and location.

Q: Is the CarLock car tracker app compatible with iOS?

A: Yes, the CarLock app is compatible with iOS.

Q: Can I monitor multiple vehicles with this car tracker?

A: Yes, you can monitor several cars from one account.

Q: How much is the monthly subscription?

A: The first month is free, so you can test the device without paying for a subscription. After that, you can choose from various subscription plans that can be paid monthly or yearly. Plans start at $9.95 per month and go up to $19.95 per month for the most premium service. Please check the attached image for a full overview of all available plans. Compared to other solutions on the market, our standard plan already offers fast refresh rates, whether the vehicle is moving or standing still. There are no contracts, activation costs, or hidden fees. Kind regards, Meg - Carlock Team

Sponsored

Reviews

Customers are saying

Customers value the 4G Car Tracker for its simple setup. Reviewers report that the device is very easy to set up. There were no cons mentioned for this product.

This summary was generated by AI based on customer reviews.
  • Setup Ease (14)
  • Accuracy (3)

Customer Images

The vast majority of our reviews come from verified purchases. Reviews from customers may include My Best Buy members, employees, and Tech Insider Network members (as tagged). Select reviewers may receive discounted products, promotional considerations or entries into drawings for honest, helpful reviews.

Compare similar products

CARLOCK - 4G Car Tracker – GPS Vehicle Tracking for Families, Teens & Fleets with Driving Score, Trip History & Geofencing - Black
CARLOCK - 4G Car Tracker – GPS Vehicle Tracking for Families, Teens & Fleets with Driving Score, Trip History & Geofencing - Black
4.9(31)

Track your vehicle with CarLock — a real-time 4G GPS car tracker designed for personal use, families, teen drivers, and small fleets. CarLock delivers fast, accurate location updates and instant alerts straight to your phone. View live location, trip history, mileage, and driving events anytime in the Android or iOS app. Monitor driving behavior with alerts for speeding, harsh braking, and sharp turns, plus customizable geofences for arrivals and departures. CarLock enhances your vehicle’s security with notifications for movement, engine starts, vibrations, or device disconnection. Easy to install via the OBD-II port, CarLock monitors your vehicle 24/7, even when the engine is off, and supports multiple vehicles in one account. With reliable coverage, detailed history, and an affordable subscription with the first month free, CarLock delivers dependable, all-in-one vehicle tracking.

Cube - GPS Vehicle Tracker with magnetic base and one year rechargeable battery - Black

GPS vehicle and asset tracker with one year rechargeable battery and powerful magnetic base. Track your vehicles or equipment worldwide using this 4G LTE vehicle tracker. Cube reports location history and speed. Set geo fences to see when your car moves in or out of boundaries you set in the app. Data plans start at $16.50/month with live real time tracking.

Lightning GPS - Easy Wired 4G Vehicle GPS Tracker - Tracking Device for Cars, Trucks, & Vehicles - Subscription Required - Black

This wired vehicle tracker is designed to be able to be installed in just a few minutes without any need for special tools or expertise, unlike most other hardwired devices. The Easy Wired GPS Tracker uses just two wires to connect to your car’s battery and can be mounted in its engine compartment, keeping it inconspicuous and out of view of people in the cabin. This makes it a great choice for both small fleet managers monitoring driver routing and parents keeping an eye on the new driver in their family. Hidden and hardwired next to your vehicle’s battery, LiveWire Volt ensures discreet monitoring. Tamper alerts notify you instantly if anyone attempts to disconnect or move your vehicle. Waterproof and durable with an IP67 rating, the device is engineered to withstand extreme weather and conditions. It won’t need recharging, keeping your vehicle safe in rain, heat, or cold. Enjoy reliable 4G GPS coverage across the U.S., Canada, and Mexico. Track your vehicles in real-time, whether it’s a car, truck, motorcycle, or fleet—stay connected wherever you go. Choose the best plan for your needs—monthly, quarterly, or annual options starting as low as $17.99/month. No long-term commitment or hidden fees. Cancel anytime with no penalties, ensuring flexibility for individual or fleet vehicles.

ShadowGPS - GPS Tracker with Real-Time Location, Motion Alerts, Geofencing, Rechargeable Battery & 1-Year Trip History - Black
5.0(1)

ShadowTrack is a compact, battery-powered GPS tracker built for vehicle owners, families, and small business fleets who need flexible, real-time location tracking across cars, kids, equipment, or assets. It works right out of the box—no installation or wiring required—and fits easily in a glovebox, backpack, toolbox, or under a vehicle with an optional magnetic case. ShadowTrack delivers instant alerts for motion detection, speed violations, geofence breaches, curfew violations, and potential tampering, all through the intuitive ShadowGPS app available on iOS, and Android. Users can view live GPS location, access up to 1 year of trip history, replay past routes with animated playback, and manage multiple trackers or users under one account. Designed for both hidden tracking and open-use scenarios, ShadowTrack offers unmatched flexibility in a discreet form factor. Backed by a US-based company with secure data storage and responsive customer support, all features are included with simple subscription plans starting at just $12/month, making it a powerful and affordable tracking solution for families and businesses alike.

Pros for CARLOCK - 4G Car Tracker – GPS Vehicle Tracking for Families, Teens & Fleets with Driving Score, Trip History & Geofencing - Black
Accuracy, Setup EaseAccuracy, Battery Life, Overall Performance, Ease of use, Magnet StrengthThere were no pros for this productThere were no pros for this product
Cons for CARLOCK - 4G Car Tracker – GPS Vehicle Tracking for Families, Teens & Fleets with Driving Score, Trip History & Geofencing - Black
There were no cons for this productConnectivityThere were no cons for this productThere were no cons for this product

Specs

No content
Sponsored

Similar products from outside of Best Buy

sponsored
Ask BlueBETA
Ask a question

Finance Options

My Best Buy® Credit Card
Buy Now, Pay Later
4 payments starting at $12.50