Tracki - GPS Universal Tracker for Vehicles - Real-Time 4G LTE Assets & Car Tracking Device (2 Yrs Subscription Required) - Black
Reviews coming soon
About this product
Subscription required for each device. #1 Best Selling for 3 years. USA made Tech. Unlimited distance real time tracking 4G LTE +3 Bands. Full USA & worldwide coverage. International SIM card included. USA based company focused in GPS tracking. Our competition are just white label resellers. Our clients to name a few, are cellular Giant Vodafone & UPS. Track Vehicles, Cars, trucks, Children, ATV, assets.
Features
Subscription required for each device.
#1 Best Selling for 3 years. USA made Tech. Unlimited distance real time tracking 4G LTE +3 Bands. Full USA & worldwide coverage. International SIM card included. USA based company focused in GPS tracking. Our competition are just white label resellers. Our clients to name a few, are cellular Giant Vodafone & UPS. Track Vehicles, Cars, trucks, Children, ATV, assets.
Smallest & lightest 1.8x1.6x 0.7in & only 1.26 oz.
Combined 4G+3G+2G technology, best coverage as opposed to trackers with only 4G connection. In USA requires AT&T or T-Mobile coverage. Includes: Strong Magnet, Waterproof Silicone Cover, Belt Clip, Key Ring & Lanyard Use as gps tracker for trailers, luggage GPS tracker, key tracker, car tracker devices. The tracker features up to 5-years location history We believe the customer is king and offer live customer support 24/7 phone and cha
Rechargeable battery lasts up to 2-5 days
(Depending on tracking mode) with real time tracking updates at 1-5min intervals and up to 60 days with 1-3 tracking updates p/day (battery saver mode). Optional 3,500mAh battery+magnetic waterproof box available providing x6 longer battery life: 3-4 weeks at 1min update and up to 10 months in battery saver mode (Search item B07YVNV82V). Use as GPS tracker for luggage, GPS tracker for kids, asset GPS tracker, vehicle tracker.
Tracking technology uses GPS primarily and Wi-Fi & GSM as a
Tracki scans for nearby WiFi routers for accurate location when GPS is unavailable. View live tracking on the map, set real-time alerts when device crosses a geo-fence zone you preset when used as gps tracking device for car, tracking device for children or valuables. Receive SOS, low-battery, speed & movement alerts via push notification, email or (optional) SMS. Use as a cars tracker, GPS tracker for vehicles, kids GPS tracker
Our lifetime warranty covers lost or damaged devices.
Tracki is cutting-edge, easy to set up and works right out-of-the-box within minutes without meddling with car & vehicle electronics. Use as a tracking device for cars, boat GPS tracker, bike tracker and more. Tracki's highly-rated dedicated mobile and web app is compatible with: Android, iOS and all web browsers (IOS 13 and up, Android 6 and up). Includes magnet attachment for GPS tracker car and waterproof silicone cover. gps para car
Specifications
- GPS EnabledYes
Reviews
This product doesn't have any reviews yet.
Compare similar products

Subscription required for each device. #1 Best Selling for 3 years. USA made Tech. Unlimited distance real time tracking 4G LTE +3 Bands. Full USA & worldwide coverage. International SIM card included. USA based company focused in GPS tracking. Our competition are just white label resellers. Our clients to name a few, are cellular Giant Vodafone & UPS. Track Vehicles, Cars, trucks, Children, ATV, assets.

GPS vehicle and asset tracker with one year rechargeable battery and powerful magnetic base. Track your vehicles or equipment worldwide using this 4G LTE vehicle tracker. Cube reports location history and speed. Set geo fences to see when your car moves in or out of boundaries you set in the app. Data plans start at $16.50/month with live real time tracking.

Protecting your high-value assets has never been easier. Whether it’s a construction trailer, a weekend boat, or your daily driver, the DroneMobile XT-LTE offers premium, long-term security without the headache of a complex installation. As a standalone, battery-powered LTE tracker, the XT-LTE is designed to go wherever your assets do, providing real-time updates and peace of mind directly to your smartphone. Includes 30 day free trial. No contracts or hidden fees, monthly subscriptions starting at $11.99.

Cube GPS Tracker can be placed discretely in your vehicle so you can track where it goes, how long it spends there, and at what speed it travels. Cube gathers data via GPS, Wi-Fi, Bluetooth, and cell tower triangulation then reports the data back via the LTE-M data plan. Plans start at $16.50/Month.; Ideal for theft recovery, fleet tracking or just keeping an eye on your valuables. Cube GPS can be hardwired into vehicles using optional OBD II plug or wired directly to the battery with the hardwire kit.; Thieves today know exactly where to go to disable the factory GPS on newer cars. Cube GPS can be a backup plan to help with recovery. Even if the thief removes the cables from the battery the Cube will still report using its own battery for up to two weeks.
| Pros for Tracki - GPS Universal Tracker for Vehicles - Real-Time 4G LTE Assets & Car Tracking Device (2 Yrs Subscription Required) - Black | |||
|---|---|---|---|
| There were no pros for this product— | Battery Life, Accuracy, Overall Performance, Ease of use, Magnet Strength | There were no pros for this product— | Battery Life, Accuracy, Ease of use, Overall Performance, GPS |
| Cons for Tracki - GPS Universal Tracker for Vehicles - Real-Time 4G LTE Assets & Car Tracking Device (2 Yrs Subscription Required) - Black | |||
| There were no cons for this product— | Connectivity, USB Port | There were no cons for this product— | Subscription, Weight |
Specs
Be the first to ask a question.
We’ll try to get your question answered within 24 hours by a Best Buy customer or brand representative.









































