1-1 of 1 Answer
Hello Jeannie, This is Michelle with GE and I am happy to help. This storage drawer JX2200NBB must be mounted to the Advantium prior to the installation. Therefore, your Advantium must be uninstalled in order to properly mount this storage drawer then install both units into your cabinet/wall opening. This storage drawer is designed to be installed with Advantium model PSB2200NBB and can also be retrofitted into the cabinet/wall openings for previous 240V Advantium models (SCB2000/1) once mounted properly. Thank you for checking.
Sorry, there was a problem. Please try again later.
