Black Friday Deals are hereEnds Nov. 28.Shop now

Skip to contentGo to Product Search
Main Content

Lenovo - ThinkVision T24v-30 24" Class Webcam Full HD LED Monitor - 16:9 - Raven 23.8" Viewable - In-plane - Black

Model: 63D8MAR3US
SKU: 13193108
Sold & shipped by

About this product

The ThinkVision T24v-30 Monitor is the perfect companion for work - especially when you need to collaborate with your teams remotely! Its 23.8-inch borderless screen size ensures that you have a monitor that's compact but still gives you enough screen real estate to view two windows side by side. You'll always get a clear view of the screen, irrespective of where you're sitting, with the In-Plane Switching panel that affords wider viewing angles with no distortion.

Highlights

Features

  • Lenovo ThinkVision T24v-30 24" Class Webcam Full HD LED

    The ThinkVision T24v-30 Monitor is the perfect companion for work - especially when you need to collaborate with your teams remotely! Its 23.8-inch borderless screen size ensures that you have a monitor that's compact but still gives you enough screen real estate to view two windows side by side. You'll always get a clear view of the screen, irrespective of where you're sitting, with the In-Plane Switching panel that affords wider

  • IPS Panel

    In-Plane Switching technology offers consistent color and wide viewing angles.

  • Built-in Webcam

    Integrated 2.0-megapixel IR and RGB camera supports Windows Hello Facial Recognition.

  • Multiple Connectivity Options

    Includes HDMI 1.4, DisplayPort 1.2, and VGA ports for versatile device connections.

  • Adjustable Stand

    Offers height, tilt, swivel, and pivot adjustments for ergonomic positioning.

Specifications

  • Refresh Rate
    144Hz
    Maximum Resolution
    1920 x 1080
    Panel Type
    IPS
    Synchronization Technology
    Not Applicable
    Screen Size
    21.5 inches
Sponsored

Reviews

Rating 5 out of 5 stars with 1 review

5 star rating. 1 review
100% would recommend to a friend

The vast majority of our reviews come from verified purchases. Reviews from customers may include My Best Buy members, employees, and Tech Insider Network members (as tagged). Select reviewers may receive discounted products, promotional considerations or entries into drawings for honest, helpful reviews.

  • Customer reviews from lenovo.com

    Syndicated rating, 4.5652175 out of 5 stars with 23 reviews on lenovo.com.

    See all lenovo.com reviews
  • Customer reviews from lenovo.com

    Syndicated rating, 4.3 out of 5 stars with 10 reviews on lenovo.com.

    See all lenovo.com reviews

Compare similar products

Lenovo - ThinkVision T24v-30 24" Class Webcam Full HD LED Monitor - 16:9 - Raven 23.8" Viewable - In-plane - Black
Lenovo - ThinkVision T24v-30 24" Class Webcam Full HD LED Monitor - 16:9 - Raven 23.8" Viewable - In-plane - Black
4.6(23)

The ThinkVision T24v-30 Monitor is the perfect companion for work - especially when you need to collaborate with your teams remotely! Its 23.8-inch borderless screen size ensures that you have a monitor that's compact but still gives you enough screen real estate to view two windows side by side. You'll always get a clear view of the screen, irrespective of where you're sitting, with the In-Plane Switching panel that affords wider viewing angles with no distortion.

Lenovo - ThinkCentre TIO24 Gen5 24" Class Webcam Full HD LED Monitor - 16:9 - 23.8" Viewable - In-plane Switching - Black
5.0(3)

Lenovo ThinkCentre TIO24 Gen5 24" Class Webcam Full HD LED Monitor - 16:9 - Black - 23.8" Viewable - In-plane Switching (IPS) Technology - WLED Backlight - 1920 x 1080 - 16.7 Million Colors - 250 Nit - 4 ms - 60 Hz Refresh Rate - Speakers - Swivel, Height, Pivot, Tilt - HDMI - DisplayPort - VESA Mount Compatible - KVM Switch

Lenovo - ThinkCentre TIO-24 Gen5 24" Class Webcam Full HD LED Monitor - 16:9 - 23.8" Viewable - In-plane Switching - Black

Lenovo ThinkCentre TIO-24 Gen5 24" Class Webcam Full HD LED Monitor - 16:9 - Black - 23.8" Viewable - In-plane Switching (IPS) Technology - WLED Backlight - 1920 x 1080 - 16.7 Million Colors - 250 Nit - 4 ms - 60 Hz Refresh Rate - Speakers - Swivel, Height, Pivot, Tilt - HDMI - DisplayPort - VESA Mount Compatible - KVM Switch

HP - E24mv G4 FHD Conferencing Monitor 23.8 LCD FHD - Black/Silver
4.5(34)

Make a great impression on video calls on this 23.8-inch full HD conferencing monitor. The integrated, 5MP tilt adjustable pop-up webcam displays a sharp, detailed picture, even in low light, and the built-in speakers and mic produce clear, lifelike sound. Everything you need to present your best self on every call.

Pros for Lenovo - ThinkVision T24v-30 24" Class Webcam Full HD LED Monitor - 16:9 - Raven 23.8" Viewable - In-plane - Black
There were no pros for this product—There were no pros for this product—There were no pros for this product—Sound Quality, Screen Size

Specs

No content

Customers often buy these together

Sponsored